Projects |
Parties |
Service Type. |
W Hotel & Residences, Palm Jumeirah, Dubai, UAE |
Al Futaim Carillion vs. Al Sharq Investment |
Submission and negotiation of variations |
Neuro Spinal Hospital & Radiosurgery Centre on Plot No. BT-D-001 – Dubiotech -Dubai. |
Neuro Spinal Hospital vs. GMC |
Commercial and Contractual Advisor |
Confidential Project |
Al Hassan Engineering vs. Hyundai, Civil Works |
Consolidated Claim (EOT + Variations+ Acceleration) |
MBR Dubai Hills Estate, Fairway Vistas (65 Villas) PA02 |
Parkway International vs. Emaar |
Commercial, Contractual, and Planning Administration |
MBR Dubai Hills Estate, PA 03 Parkway Vistas (61 Villas) |
Parkway International vs. Emaar |
Commercial, Contractual, and Planning Administration |
MBR Dubai Hills Estate, Golf Clubhouse |
Parkway International vs. Emaar |
Extension of Time Preparation with Commercial, Contractual, and Planning Administration |
3 X 132/11KV Substations at Deira Islands A & B |
Al Hassan vs. Siemens, 2 Projects, Substations with DEWA |
Consolidated Claim (EOT + Variations+ Interest) |
Neuro Spinal Hospital & Radiosurgery Centre on Plot No. BT-D-001 – Dubiotech -Dubai |
NSH vs. Green Modeling Contracting |
Expert Report for Disputed Variations and Claims |
Confidential Project |
Al Hassan Engineering vs. Petrofac |
Consolidated Claim (EOT + Variations+ Interest) |
Confidential Project |
Al Hassan Engineering vs. Hyundai, Mechanical and Instrumental Works (Oil and Gas) |
Consolidated Claim (EOT + Variations+ Acceleration) |
Confidential Project |
Al Hassan Engineering vs. G.S. Engineering, Oil and gas |
Consolidated Claim (EOT + Back charges + Loss of Productivity) |
Modun P – 123 Phase II |
Dubai Properties vs. Shapoorji Pallonji Mideast |
Extension of Time Claim Enhancement, Negotiation, and Finalization |
Green Community West Extension, Phase III, Plots No. 598-1010 & 598-1282, Dubai Investment Park, Dubai |
Properties Investment vs. Shapoorji Pallonji Mideast |
Extension of Time Claim Preparation, Variations Preparation and Enhancement, Negotiation, and Dispute Resolution |
Construction Of 2B +G + 1ST +5TYP.FLOOR +ROOF, HOTEL BUILDING, AL BARSHA 1st, DUBAI, UAE |
Al Adnan Contracting vs. Mr. Adel Noori Jaber Ali |
Extension of Time Claim Preparation and negotiation |
Tower A, B, and C of “Carson” Plot 2423 (676-5407) at the Akoya by Damac |
Al Arif Contracting vs. Damac Properties |
Extension of Time Claim Preparation and negotiation |
Fitting – out work and Maintenance of Neuro Spinal Hospital & Radiosurgery Centre on Plot No. BT-D-001 – Dubiotech -Dubai |
Al Mazroui Medical Group LLC |
Planning and Contractual Services. |
Al Reziza Tower on Plot No. 82, Al Khobar, KSA |
Shapoorji Pallonji Mideast L.L.C. vs. Al Reziza Private Property and Investment |
Extension of Time Claim Preparation, Presentation, Negotiation, and Dispute Resolution |
AKH Commercial Tower on Plot No. 47, Sector 1/74, Dammam, KSA |
Shapoorji Pallonji Mideast L.L.C. vs. Abdulkarim Holding Co. |
Extension of Time Claim Preparation, Presentation, Negotiation, and Dispute Resolution |
(B+G+6+R) Construction of Residential Building on Plot No. (4210538) at Al Warqaa First, Dubai -UAE |
Ali Ahmed Mohammed Al Habbai vs. Evershine Contracting L.L.C. |
Preparation of the Third Party Report evaluating both Parties’ Claims and variations, support the Employer towards Amicable Settlement, and assist the Employer in any Dispute Resolution |
Dubai Police Compound on Plot No. 824 6410 – Umm Al Daman, Dubai, UAE |
Saifco Electromechanical Works L.L.C vs. Intermass Engineering & Contracting L.L.C |
Reviewing the Contract Terms and Conditions and negotiating them till signing the Contract between the Parties |
MBR – Dubai Hills Estate – Package 21, Dubai, UAE |
Al Nasr Contracting Company L.L.C vs. Dubai Hills Estate L.L.C |
Preparation of Third-Party Peer Review for the submitted “Extension of Time Claim and other Compensation |
MBR – Dubai Hills Estate Development, Chilled Water Network – Phase One, Dubai, UAE |
Carlisle Technical Services L.L.C vs. Amana Pipeline Construction L.L.C |
Preparation of new Variation Claims, TOC, Final account and reply, negotiate Contra Charges issued to the Subcontractor till finalizing of the Final Account. |
Fakeeh University Hospital on Plot No. 15-006, Dubai Silicon Oasis, Dubai, UAE |
Middle East Consolidated International Contracting L.L.C vs. Dr. Soliman Fakeeh Academic Medical Center FZCO |
Extension of Time Claim Preparation, Presentation, and Negotiation |
Nasma Residences – Phase 2B (107 Villas), Sharjah, UAE |
Light Moon Electromechanical Contracting L.L.C vs. Klampfer Middle East L.L.C |
Extension of Time Claim Preparation, Presentation, and Negotiation |
Madinat Jumirah – Phase 2 – Umm Suqeim, Dubai, UAE |
Saifco Electromechanical Works L.L.C vs. Al Sahel Contracting Company L.L.C |
Reviewing the Contract Terms and Conditions and negotiating them till signing the Contract between the Parties |
Confidential Project |
Al Nasr Contracting Company L.L.C vs. Confidential |
Extension of Time Claim Preparation, Presentation, and Negotiation |
Mercure Hotel Refurbishment – Phase 1 & 2 – Barsha Heights, Dubai, UAE |
Middle East Consolidated International Contracting L.L.C vs. Mercure Hotel Suites & Apartments FZ L.L.C |
Extension of Time Claim Preparation, Presentation, and Negotiation |
Confidential Project |
Round AED 140M – ICC Rules – Abu Dhabi Seat |
Third Party Independent Expert Witness in Dispute Resolution |
Residential / Commercial Building in Jaddaf |
MRG vs. Aram Contracting |
Third Party Independent Consultant in Dispute Resolution |
I Love Florence Tower |
Saifco Electromechanical Works L.L.C vs. Delta Al Emarat |
Reviewing the Contract Terms and Conditions and negotiating them till signing the Contract between the Parties |
Emirates Hospital, Al Qusais, Dubai, UAE |
Saifco Electromechanical Works L.L.C vs. Al Sahel Contracting Company L.L.C |
Reviewing the Contract Terms and Conditions and negotiating with Contractual Support |
Construction of Proposed 4B+G+3P+19 Floors Commercial/Office Building on Plot BB.A03.043, Business Bay - Dubai, UAE |
S. S. Lootah Contracting Co. vs. Mohammed Abdullah Al Sayyah |
Third Party Independent Consultant in Dispute Resolution |
G+P+8+R Commercial and Residential Building, Dubai, UAE |
Arbitration under DIAC Rules, Claim and Counter Claim is around AED 10.6 |
Independent Consultant and Advisor in Dispute Resolution |
B+G+P+8+R Commercial and Residential Building, Dubai, UAE |
Arbitration under DIAC Rules, Claim and Counter Claim is around AED 10.4 million |
Independent Consultant and Advisor in Dispute Resolution |
2B+G+8+R Hotel Building, Dubai, UAE |
Arbitration under DIAC Rules, Claim and Counter Claim is around AED 22.6 million |
Independent Consultant and Advisor in Dispute Resolution |
Project in Abu Dhabi |
Arbitration under ADCCAC Rules, Claim is around AED 8 million |
Co-Arbitrator |
Court Case for three Projects in Dubai |
GIBCA Dubai LLC (Sharjah Branch) vs. Electra Electromechanical Cont. |
Preparation of the Third Party Report evaluating both Parties’ Claims and variations, and assist the Employer in the Dispute Resolution |
Vertical Farming Facility |
GAMI Air Conditioning Manufacturing Company LLC |
Contract and delay administration and management |
Private Villa Dubai -UAE |
MODERN DESIGN CONTRACTING CO. LLC |
Preparation of the Third Party Report evaluating both Parties’ Claims and variations, and assist the Employer in the Dispute Resolution |