Projects Parties Service Type.
W Hotel & Residences, Palm Jumeirah, Dubai, UAE Al Futaim Carillion vs. Al Sharq Investment Submission and negotiation of variations
Neuro Spinal Hospital & Radiosurgery Centre on Plot No. BT-D-001 – Dubiotech -Dubai. Neuro Spinal Hospital vs. GMC Commercial and Contractual Advisor
Confidential Project Al Hassan Engineering vs. Hyundai, Civil Works Consolidated Claim (EOT + Variations+ Acceleration)
MBR Dubai Hills Estate, Fairway Vistas (65 Villas) PA02 Parkway International vs. Emaar Commercial, Contractual, and Planning Administration
MBR Dubai Hills Estate, PA 03 Parkway Vistas (61 Villas) Parkway International vs. Emaar Commercial, Contractual, and Planning Administration
MBR Dubai Hills Estate, Golf Clubhouse Parkway International vs. Emaar Extension of Time Preparation with Commercial, Contractual, and Planning Administration
3 X 132/11KV Substations at Deira Islands A & B Al Hassan vs. Siemens, 2 Projects, Substations with DEWA Consolidated Claim (EOT + Variations+ Interest)
Neuro Spinal Hospital & Radiosurgery Centre on Plot No. BT-D-001 – Dubiotech -Dubai NSH vs. Green Modeling Contracting Expert Report for Disputed Variations and Claims
Confidential Project Al Hassan Engineering vs. Petrofac Consolidated Claim (EOT + Variations+ Interest)
Confidential Project Al Hassan Engineering vs. Hyundai, Mechanical and Instrumental Works (Oil and Gas) Consolidated Claim (EOT + Variations+ Acceleration)
Confidential Project Al Hassan Engineering vs. G.S. Engineering, Oil and gas Consolidated Claim (EOT + Back charges + Loss of Productivity)
Modun P – 123 Phase II Dubai Properties vs. Shapoorji Pallonji Mideast Extension of Time Claim Enhancement, Negotiation, and Finalization
Green Community West Extension, Phase III, Plots No. 598-1010 & 598-1282, Dubai Investment Park, Dubai Properties Investment vs. Shapoorji Pallonji Mideast Extension of Time Claim Preparation, Variations Preparation and Enhancement, Negotiation, and Dispute Resolution
Construction Of 2B +G + 1ST +5TYP.FLOOR +ROOF, HOTEL BUILDING, AL BARSHA 1st, DUBAI, UAE Al Adnan Contracting vs. Mr. Adel Noori Jaber Ali Extension of Time Claim Preparation and negotiation
Tower A, B, and C of “Carson” Plot 2423 (676-5407) at the Akoya by Damac Al Arif Contracting vs. Damac Properties Extension of Time Claim Preparation and negotiation
Fitting – out work and Maintenance of Neuro Spinal Hospital & Radiosurgery Centre on Plot No. BT-D-001 – Dubiotech -Dubai Al Mazroui Medical Group LLC Planning and Contractual Services.
Al Reziza Tower on Plot No. 82, Al Khobar, KSA Shapoorji Pallonji Mideast L.L.C. vs. Al Reziza Private Property and Investment Extension of Time Claim Preparation, Presentation, Negotiation, and Dispute Resolution
AKH Commercial Tower on Plot No. 47, Sector 1/74, Dammam, KSA Shapoorji Pallonji Mideast L.L.C. vs. Abdulkarim Holding Co. Extension of Time Claim Preparation, Presentation, Negotiation, and Dispute Resolution
(B+G+6+R) Construction of Residential Building on Plot No. (4210538) at Al Warqaa First, Dubai -UAE Ali Ahmed Mohammed Al Habbai vs. Evershine Contracting L.L.C. Preparation of the Third Party Report evaluating both Parties’ Claims and variations, support the Employer towards Amicable Settlement, and assist the Employer in any Dispute Resolution
Dubai Police Compound on Plot No. 824 6410 – Umm Al Daman, Dubai, UAE Saifco Electromechanical Works L.L.C vs. Intermass Engineering & Contracting L.L.C Reviewing the Contract Terms and Conditions and negotiating them till signing the Contract between the Parties
MBR – Dubai Hills Estate – Package 21, Dubai, UAE Al Nasr Contracting Company L.L.C vs. Dubai Hills Estate L.L.C Preparation of Third-Party Peer Review for the submitted “Extension of Time Claim and other Compensation
MBR – Dubai Hills Estate Development, Chilled Water Network – Phase One, Dubai, UAE Carlisle Technical Services L.L.C vs. Amana Pipeline Construction L.L.C Preparation of new Variation Claims, TOC, Final account and reply, negotiate Contra Charges issued to the Subcontractor till finalizing of the Final Account.
Fakeeh University Hospital on Plot No. 15-006, Dubai Silicon Oasis, Dubai, UAE Middle East Consolidated International Contracting L.L.C vs. Dr. Soliman Fakeeh Academic Medical Center FZCO Extension of Time Claim Preparation, Presentation, and Negotiation
Nasma Residences – Phase 2B (107 Villas), Sharjah, UAE Light Moon Electromechanical Contracting L.L.C vs. Klampfer Middle East L.L.C Extension of Time Claim Preparation, Presentation, and Negotiation
Madinat Jumirah – Phase 2 – Umm Suqeim, Dubai, UAE Saifco Electromechanical Works L.L.C vs. Al Sahel Contracting Company L.L.C Reviewing the Contract Terms and Conditions and negotiating them till signing the Contract between the Parties
Confidential Project Al Nasr Contracting Company L.L.C vs. Confidential Extension of Time Claim Preparation, Presentation, and Negotiation
Mercure Hotel Refurbishment – Phase 1 & 2 – Barsha Heights, Dubai, UAE Middle East Consolidated International Contracting L.L.C vs. Mercure Hotel Suites & Apartments FZ L.L.C Extension of Time Claim Preparation, Presentation, and Negotiation
Confidential Project Round AED 140M – ICC Rules – Abu Dhabi Seat Third Party Independent Expert Witness in Dispute Resolution
Residential / Commercial Building in Jaddaf MRG vs. Aram Contracting Third Party Independent Consultant in Dispute Resolution
I Love Florence Tower Saifco Electromechanical Works L.L.C vs. Delta Al Emarat Reviewing the Contract Terms and Conditions and negotiating them till signing the Contract between the Parties
Emirates Hospital, Al Qusais, Dubai, UAE Saifco Electromechanical Works L.L.C vs. Al Sahel Contracting Company L.L.C Reviewing the Contract Terms and Conditions and negotiating with Contractual Support
Construction of Proposed 4B+G+3P+19 Floors Commercial/Office Building on Plot BB.A03.043, Business Bay - Dubai, UAE S. S. Lootah Contracting Co. vs. Mohammed Abdullah Al Sayyah Third Party Independent Consultant in Dispute Resolution
G+P+8+R Commercial and Residential Building, Dubai, UAE Arbitration under DIAC Rules, Claim and Counter Claim is around AED 10.6 Independent Consultant and Advisor in Dispute Resolution
B+G+P+8+R Commercial and Residential Building, Dubai, UAE Arbitration under DIAC Rules, Claim and Counter Claim is around AED 10.4 million Independent Consultant and Advisor in Dispute Resolution
2B+G+8+R Hotel Building, Dubai, UAE Arbitration under DIAC Rules, Claim and Counter Claim is around AED 22.6 million Independent Consultant and Advisor in Dispute Resolution
Project in Abu Dhabi Arbitration under ADCCAC Rules, Claim is around AED 8 million Co-Arbitrator
Court Case for three Projects in Dubai GIBCA Dubai LLC (Sharjah Branch) vs. Electra Electromechanical Cont. Preparation of the Third Party Report evaluating both Parties’ Claims and variations, and assist the Employer in the Dispute Resolution
Vertical Farming Facility GAMI Air Conditioning Manufacturing Company LLC Contract and delay administration and management
Private Villa Dubai -UAE MODERN DESIGN CONTRACTING CO. LLC Preparation of the Third Party Report evaluating both Parties’ Claims and variations, and assist the Employer in the Dispute Resolution